CMN Permitting and Construction Maintenance is a remote Right-of-Way permit expediting firm led by Carolyn Edwards Herron. We handle the full permit lifecycle โ from pre-application through issuance and closeout โ so your team stays focused on building. We cover jurisdictions nationwide, excluding the City of Atlanta.
ADA compliance, pedestrian detour routing, engineer-stamped drawings.
Stamped, colored & patterned concrete; specialty finish specs; ROW encroachment.
Cross-gutter / flume permits, drainage alignment, tie-in to curb & gutter.
Setback from intersections, sight distance, curb cut dimensions per agency standards.
Material specs, historic district requirements, profile & tie-in drawings, inspection coordination.
Drainage impact, compaction testing, form/pour inspection scheduling.
Depth clearances, horizontal alignment drawings, 811 locates, inadvertent return plan, restoration bonds.
Utility installation permit, trench safety plan, as-built drawings, CCTV inspection docs.
Tap-on-main, backflow prevention, service line sizing, pressure testing.
Shot clock compliance, collocation, pole attachment, FCC 6409, equipment cabinet encroachments.
MUTCD-compliant TCPs, flagger certification, peak-hour restrictions, detour routing.
Moratorium road restrictions, saw-cut requirements, surface restoration bonds.
ROW dumpster/roll-off permits, placement setback requirements, reflective marking compliance.
Designated haul route filings, hours-of-operation restrictions, weight-sensitive road coordination.
State and local oversize/overweight permits, escort requirements, route surveys and bridge clearance checks.
Scope review, permit type selection, agency requirements, timeline advice.
Full application prep, document upload, fee verification, portal submission.
Status monitoring, deficiency response, inspection coordination, permit delivery & bond release.
Flat fee per permit. One-off filings at standard processing pace.
Flat fee per permit. Priority handling when the schedule can't slip.
Built for high-volume, ongoing permit pipelines.
Bundled coverage for multi-permit projects.
Rates shown are typical starting ranges based on scope and jurisdiction; final pricing is confirmed after project review. Hourly work (when required) is billed at $75โ$125/hr. Agency permit fees, bonds, and third-party costs are passed through at cost and are not included in service fees.
Once work wraps, the right-of-way still has to be handed back clean โ debris cleared, surfaces restored, and the site left ready for final inspection.
Debris removal and surface cleanup for typical sidewalk, curb, or apron work.
Backfill cleanup, pavement patch cleanup, and restoration bond documentation.
Bundled cleanup across several permit locations on the same project.
Typical range: $300โ$1,200 per site depending on debris volume and site size; larger trench/boring restorations and multi-site bundles quoted individually. Cleanup is billed separately from permit expediting fees.
Call or email Carolyn today โ we can begin processing your permits within 24 hours of receiving your project details.